![GB50402-2007烧结机械设备工程安装验收规范(英文版)](https://wfqqreader-1252317822.image.myqcloud.com/cover/849/33688849/b_33688849.jpg)
6.11 Head Bending Rail and Intermediate Rail
Ⅰ Dominant Item
6.11.1 Preset thermal expansion gap for rail joints must meet requirements of design technical document.
Check quantity:to check all.
Inspection method:to check installation.
Ⅱ General Item
6.11.2 Installation for head bending rail shall take chain blade of head wheel as reference;tolerance for installation of the bending rail shall meet requirements in Table 6.11.2,see Figure 6.11.2.
Check quantity:to check all.
Inspection method:see Table 6.11.2.
Table 6.11.2 Tolerance for installation of head bending rail
![img](https://epubservercos.yuewen.com/7ECCA0/18000635208206206/epubprivate/OEBPS/Images/txt006_14.jpg?sign=1739558187-rZLKMubbcltMXDZapOzMF5w7B5hH3BbO-0-7153da7cdaebd04e7a286466d064c0fe)
![img](https://epubservercos.yuewen.com/7ECCA0/18000635208206206/epubprivate/OEBPS/Images/txt006_15.jpg?sign=1739558187-aEBx3NNb5eNI7qVyh0UcNUZGTiNxwEWV-0-c8100a69add100410672f0114b919d24)
Figure 6.11.2 Head bending rail
1-Chain wheel;2-Head bending rail;3-Longitudinal centerline of sintering equipment
6.11.3 Tolerance for intermediate rail shall meet requirements in Table 6.11.3.
Check quantity:to check all.
Inspection method:see Table 6.11.3.
Table 6.11.3 Tolerance for installation of intermediate rail
![img](https://epubservercos.yuewen.com/7ECCA0/18000635208206206/epubprivate/OEBPS/Images/txt006_16.jpg?sign=1739558187-cxt6TgrVYbRuIwIwoweLbykXRaM5w7R5-0-12be18872e0450c076404f56cd3e9e0d)